Email               : prothorn@btinternet.com
TECHNICAL PAINT CONSULTANTS SPECIFIERS AND DESIGNERS TO INDUSTRY
Telephone/Fax : 0191 387 5060
Mobile             : 07747 186 535
Home. Anti Vandal. Roofs. Steelwork. Hygienic. Floors. Walls. Home | Anti Vandal | Roofs | Steelwork | Hygiene | Floors | Walls | Contact | Anti Profile | Roofs Profile | Steel Profile | Hygiene Profile | Floors Profile | Walls Profile 
Site designed and maintained by Web Design at out-n-about
This specialist Steel coating was specified and supplied by Prothorn Consultant This specialist Steel coating was specified and supplied by Prothorn Consultant This specialist Steel coating was specified and supplied by Prothorn Consultant This specialist Steel coating was specified due to it's excellent performance properties  This specialist Steel coating was specified and supplied by Prothorn Consultant  This specialist Steel coating was specified and supplied by Prothorn Consultant This specialist Steel coating was specified and supplied by Prothorn Consultant This specialist Steel coating was specified and supplied by Prothorn Consultant This specialist Steel coating was specified and supplied by Prothorn Consultant This specialist Steel coating was specified due to it's excellent performance properties. This specialist Steel coating was specified and supplied by Prothorn Consultant
Steelwork This specialist Steel coating was specified and supplied by Prothorn Consultant
Coating of  Below Ground Steel Pipe  work  and  fittings in a busy W.T.W  Main  Complex.  A Two  component Solvent Free Surface Tolerant Epoxy system was applied to the Steel items due to  the Level  of  preparation,  the restricted environment and the nature and composition of the substrate.
                                                                                     2003
A  Large Department  Store  internal Roof structure  was protected using a Water Borne single pack Intumescent coating  system. The bare  Steelwork was abrasive blasted then primed with an  Epoxy  Primer, followed  by  800 microns (dft ) of an Intumescent coat to  give up to 2 hours fire  protection.  
                                                                                       2002
External painting to over 4, 500m2 of Plastisol  Cladding. This successfully Completed  project upgraded  the old existing dark brown vertical cladding by applying two coats of a single pack Elastomeric  Polyurethane UV colour stable finish. The system enhanced the fabric of  the complex with  a 10 year maintenance free coating.
                                                                                        1997
Two component Solvent Free Epoxy Resin system was applied to this old corroded Pipe Bridge Structure. The Surface  Tolerant  properties  were  a key  feature of the system. The Steel Bridge and pipeline  now  have  an extended life of 25 years to first maintenance.
                              
                                                                                       2004
Refurbishment of degraded Steel Staircases and  Balcony Railings. The heavily corroded structures were treated with an advanced High Solids Epoxy Primer and a UV colour stable two component finish giving a maintenance free long term system.

                                                                                        1997
The Steelwork of an old  30m span  River Bridge was abrasive blasted and coated  with a  Solvent Free Rail track RT 98 endorsed material This High Build Epoxy system was applied in a  single coat application at  500   microns  ( dft ) ensuring  a  service life in excess of 25 years.

                                                                                     2002
The severely corroded exterior of the five Steel Storage tanks were abrasive blast cleaned, to remove all the existing degraded paint. A two pack solvent based Epoxy Primer was applied to the Steel, followed by a UV colour stable chemical  resistant  two pack  Polyurethane finish.

                                                                                        1997
Flaking,  Peeling  and  degraded Plastisol Vertical  Cladding  was fully chemically stripped  back  to a Bare Galvanized substrate. Two pack Epoxy Primer &  high build single pack Elastomeric Polyurethane finish was then applied, giving a 10 year colour stable finish.

                                                                                      2002
Potable Water approved coating system applied to the internal of Two 2.5m  x  25m long Thames Water  Contact  Vessels.  These new Steel vessels were abrasive blasted  then  500 microns of  a Solvent  Free  Epoxy  endorsed coating applied prior to delivery to site.

                                                                                       2002
Water - Borne Technology  at  its best. This successfully completed project for Skoda allowed for  all the external and internal window frames and fittings to be changed to the new Corporate colours.The new  Silver  Metallic system  completely transformed the overall appearance of the building.

                                                                                         2002
Sub - Sea Habitat Structural Steelwork exposed to harsh environmental immersed conditions. Was fully coated with a Two Pack  High Build Epoxy resin system to 400 microns (dft ). This high performance system allowed  for  the  full encapsulation of the Steelwork after abrasive blasting.
                                                                                   1996
Major  building  refurbishment  of  a  large Brewery complex.. This critical extensive  upgrade  of  the  buildings Steelwork  structure  was  undertaken using a  two component  High Build Solvent Free Surface Tolerant Epoxy system at  500 microns. This was over coated with a Polyurethane UV colour stable durable gloss finish.  